$400 Billion and Up: Cleaning Up Pollution from Nuclear Weapons

The cost of cleaning up pollution from nuclear weapons manufacturing is estimated to be  $377 billion.  This reflects cleanup cost estimates for 16 sites across the United States. Two of these, the Hanford site in Washington and Savannah River site in South Carolina, have most of  nuclear waste stored in tanks, which is particularly costly and complicated to treat.

family type bomb shelter (picture 1958)

These clean up costs  grew by $214 billion between 2011 and 2018 and they will continue to grow for several reasons including the lack of a program-wide cleanup strategy and reliance primarily on individual sites to locally negotiate cleanup activities and establish priorities. For example, the Hanford and Savannah River sites plan to treat similar radioactive tank waste differently, with Hanford’s efforts possibly costing tens of billions more than Savannah River’s. In addition, the government manages most of its cleanup work as operations activities, under less stringent requirements than other environmental remediation projects. For example, operations activities are not subject to independent oversight.

Excerpts adapted from GAO, Environmental Liability Continues to Grow, and Significant Management Challenges Remain for Cleanup Effort, May 1, 2019.

The Underground Nuclear Tank Farms: Hanford

After spending billions of dollars over several decades to remove radioactive waste leaking from a plant where nuclear bombs were made, the U.S. Department of Energy has come up with a new plan: leave it in the ground.  The shuttered Hanford Nuclear Reservation, which produced plutonium for U.S. atomic weapons from World War II through the Cold War, is the nation’s largest nuclear cleanup site with about 56 million gallons of waste stored in leak-prone underground tanks in south-central Washington State.  The Energy Department has proposed to effectively reclassify the sludge left in 16 nearly empty underground tanks from “high-level” to “low-level” radioactive waste. The re-classification would allow the department to fill the tanks with grout, cover them with an unspecified “surface barrier,” and leave them in place.

But environmental groups and others say the plan amounts to a semantic sleight of hand that will leave as much as 70,000 gallons of remaining nuclear sludge — some of which could be radioactive for millions of years — in the ground…

The cleanup operations at Hanford are projected to cost more than $100 billion, and the Energy Department has already spent more than $19 billion, according to the Government Accountability Office. The reclassification could save the department billions of dollars. It would also open the door to doing the same for all 177 tanks on the sprawling 586-square-mile reservation.

The Columbia River borders the Hanford land for almost 50 miles and some of the tanks are as close as five miles (eight kilometers) to the river, the largest in the Pacific Northwest and the source of irrigation for agriculture and drinking water for downstream citiesions.

Opponents include the Yakama Nation, whose reservation is located 20 miles west of the Hanford site and that has treaty rights to the Chinook salmon that spawn in the Columbia River. The nation wrote in comments to the agency that leaving the waste in unstable shallow land is “simply bad policy.”

Excerpts from Ari Natter, Plan to Leave Buried Nuclear Bomb Waste Underground Draws Fire, Bloomberg, Nov. 29, 2018

Breathing in Plutonium Dust: Hanford

The Energy Department project to tear down the Plutonium Finish Plant at the Hanford Site was halted in mid-December 2017 after radioactive dust was discovered far off the plant site. T As crews demolished a shuttered nuclear weapons plant during 2017 in central Washington, specks of plutonium were swept up in high gusts and blown miles across a desert plateau above the Columbia River.  The releases at the Department of Energy cleanup site spewed unknown amounts of plutonium dust into the environment, coated private automobiles with the toxic heavy metal and dispensed lifetime internal radioactive doses to 42 work

The contamination events went on for nearly 12 months, getting progressively worse before the project was halted in mid-December. Now, state health and environmental regulators, Energy Department officials and federal safety investigators are trying to figure out what went wrong and who is responsible.

The events at the Hanford Site, near the Tri-Cities area of Richland, Pasco and Kennewick, vividly demonstrate the consequences when a radioactive cleanup project spirals out of control.

The mishap occurred at one of the nation’s most radioactively contaminated buildings, known as the Plutonium Finishing Plant. The factory, which opened in 1949 a few miles from the Columbia River, supplied plutonium for thousands of U.S. nuclear weapons before it was shut down in 1989.
The exposures from the plutonium releases in 2017 were minuscule bestimated to be a small fraction of the background radiation that every human gets from nature. But unlike cosmic radiation or radon gas, plutonium can lodge itself inside the body and deliver tissue damaging alpha particles over a lifetime…. As workers removed equipment to prepare for walls to be torn down, air monitoring alarms sounded almost every day, he said. Workers were subjected to repeated nasal smears to determine if they had breathed plutonium dust, he said….Seven employee automobiles were contaminated at the plant site, according to a Jan. 9, 2018 letter from the state Department of Ecology to Doug Shoop, the federal site chief at Hanford… The demolition, costing $57 million, was being conducted by one of the nation’s largest engineering firms, CH2M, a unit of Texas-based Jacobs Engineering. CH2M is now under federal investigation for the releases, according to a letter sent by the Energy Department’s enforcement office in late March 2018…

In March 2018, the company released a preliminary analysis [pdf] of the contamination and blamed it on a half dozen factors, including a “fixative” that was supposed to bind the dust but was too diluted to work properly and a decision to accelerate demolition when the contamination seemed to be stable.  The Energy Department plan for the demolition originally required the contractor to remove debris as it accumulated. But in January 2017, just before the first releases, officials authorized CH2M to allow the debris to pile up, according to a monthly site report by an inspector for the Defense Nuclear Facilities Safety Board, an independent agency.  In fact, workers at the plant said the demolition site was ringed by 8-foot-tall piles of radioactive debris with little to prevent dust from blowing off

The problems at the Plutonium Finishing Plant were not an isolated event at Hanford, which has struggled with its cleanup for more than a decade.
Work was stopped five years ago on key parts of a $16.8-billion waste treatment plant that is supposed to turn 56 million gallons of radioactive sludge into glass. Technical deficiencies in its design are still being studied, while delays mount. Several years ago, the Energy Department pushed back the full startup by 17 years to 2039, though it hopes to begin treating some less radioactive waste by 2022….In 2017, a tunnel that stored railroad cars full of contaminated equipment collapsed. The Energy Department pumped the 358-foot long tunnel full of a concrete mixture. A decision is pending about what to do with a second storage tunnel 1,688 feet long.

The state attorney general, along with Hanford Challenge and a union, is suing the Energy Department for venting noxious gases from underground waste tanks over recent years, sickening workers.

Smith, the Ecology manager, said a lot of cleanup progress has been made at Hanford. Hundreds of buildings have been torn down. Much of the soil along the banks of the Columbia River has been cleaned up enough for any future use. And the site’s nine nuclear reactors have been put in stable condition…

One of those facilities, known as 324 Building,[Chemical Materials Engineering Laboratory] was used to extract plutonium from spent fuel, said Robert Alvarez, a former assistant secretary of Energy and a longtime critic of the cleanup. The facility has civilian waste from Germany, sent as part of a research project, as well as large amounts of radioactive waste that was placed in unlined burial pits, he said. Records of what lies in the pits were destroyed in 1988, he said.

Excerpts from RALPH VARTABEDIAN, Contamination from a nuclear cleanup forced a shutdown. Investigators want to know who is responsible, LA Times, Apr. 16, 2018

50 Million Gallons Nuclear Waste: Hanford

A federal court hearing set for October 2016 could reshape safety rules at the federal government’s Hanford nuclear-weapons-production complex in south central Washington state, where critics contend noxious vapors from underground tanks have harmed workers.At the hearing in Spokane, Wash., Judge Thomas O. Rice plans to consider motions filed by the Washington attorney general and private parties for a preliminary injunction requiring that certain safety measures be taken, including greater use of portable breathing apparatuses.

The parties say workers were exposed to vapors from the underground tanks, which hold more than 50 million gallons of radioactive and chemical waste. The waste was created when Hanford, which closed in the late 1980s, produced plutonium for the atomic-weapons program.

The injunction requests are part of litigation filed last year over the vapor issue against the Energy Department and one of its major Hanford contractors by the state, as well as an environmental and workers-advocacy group and a local labor union.

Earlier in 2016 “over 50 Hanford tank farm workers were sickened by toxic vapors spewed into the air,” said a court filing by the attorney general’s office. Over the years, hundreds or more workers have suffered problems ranging from nosebleeds and headaches to long-term lung and brain damage, the plaintiffs contend….

The Energy Department, which oversees the cleanup, in a court filing called the injunction motions “an unwarranted intrusion into DOE’s ongoing cleanup operations, including the world-class worker-safety and industrial-hygiene measures” the agency has put in place….Granting the preliminary injunction could also delay by up to five years efforts to comply with a separate court-mandated schedule for emptying tanks as part of a long-term plan to treat and dispose of the waste, the filing said. Among other things, workers using supplied-air packs “generally move more slowly,” it added.

Excerpts from At Hanford Nuclear Site, Hearing on Tap After Workers Complain of Noxious Vapors, WSJ, Oct. 1, 2016